CBC and Highways England have advised of the following temporary road closures, please see links for further details.
M1
Following the pavement lowering works that were planned to take place between Friday 22 October – Monday 25 October. Due to unforeseen circumstances with the equipment making the specialist surfacing material, we were unable to complete these works. The road reopened on Saturday 23 October.
The M1 between junctions 14 to 15 northbound will now be closed for 56 hours from 10pm on Friday 19 November to 6am on Monday 22 November. The closure will allow engineers to lower the motorway surface at Tongwell Lane Farm bridge and adjusting the gradients on the carriageway at Little Linford Lane bridge. This work is necessary because the bridge is currently too low for traffic such as lorries once this section of the M1 becomes a four-lane motorway.
During the road closure, drivers will be encouraged to plan ahead and to use alternative routes such as the M40, A1 or the M11 with the A14. We will also ask motorists to avoid this section of the M1 and surrounding roads if possible. Diversion routes will be clearly signed for the duration of this road closure. We also advise drivers to follow the signed diversion routes and not their own Satnavs to discourage them from choosing unsuitable routes.
Church St, Aspley Guise
Reason: Vegetation Clearance
Length affected: Opposite The Old Rectory
Date: The closure will be in place from 0800-1800hrs on 26th January 2022
2021 11 02 CBC9714 Church Street AG
Mount Pleasant, Aspley Guise / Horsepool Lane, Husborne Crawley
Reason: Permanent Carriageway Patching
Length affected: Mount Pleasant o/s yerlands and Horsepool Lane Jct with Turnpike Rd to no 14
Date: The closure will take place from 20th to 24th January between the hours of 0800-1800hrs
2021 11 04 CBC9714 Mount Pleasant AG
Aspley Lane, Aspley Guise
Reason: Carriageway patching
Length affected: Near Birchmoor Lodge
Date: The closure will take place from the 20th to 24th January 2022 from 0900-1530
2021 11 09 CBC9704 Aspley Lane AG
Wood Lane, Aspley Guise
Application from: Southern Gas Networks
Reason: New Service
Length affected: o/s no 3 West Bank Cottages
Date: The closure will take place from 26th January to 1st February for 24hrs a day
2021 11 11 CBC9702 Wood Lane AG
Weathercock Lane, Aspley Guise
Reason: Permanent Carriageway Patching
Length affected: o/s no 3
Date: The closure will take place from 14th to 18th February between the hours of 0900-1530hrs
2021 11 11 CBC9687 Weathercock Lane AG
The Mount, Aspley Guise
Reason: Carriageway and Footway Patching
Length affected: Entire Length
Date: The closure will take place from 10th to 14th January 2022 between the hours of 0800-1800